CONSTRUCTION LOAN ADMINSTRATION
Ruggles Center
Project Description:
Location:
Developer:
Client:
Construction Amount:

165,000 sq. ft. office building
Boston, MA.
Metropolitan-Columbia Plaza J.V.
BankBoston
$12,500,000

Services Provided: Provide construction loan administrative services for the construction of a nine story, 165,000 sq. ft. office building. Perform plan review and cost confirmation; review construction schedule and contract administrative procedures; periodic inspections; review soils disposition plan (21E); review change orders; review construction progress payment request; prepare monthly progress reports.

Summer Hill Shopping Center
Project Description:

Location:
Developer:
Architect:
Client:
Construction Amount:

Shopping Center anchored by a Stop & Shop Super store
Kingston, MA
Summer Hill Associates- Joseph Iantoska
Sumner-Schein
BankBoston
$9,500,000

Services Provided: Provide construction loan administrative services for a 95,000 sq. ft. shopping center containing twelve stores with 580 parking spaces and an on-site waste treatment plant. Performed technical review of plans and specifications; construction cost confirmation for shopping center; waste treatment plant; special soils dynsification program; methane gas collection system; site retaining walls; street reconfiguration and traffic control system. Reviewed construction contracts; project schedule; cash flow projections etc. Performed periodic inspections, reviewed change orders and monthly construction advance request from four separate general contractors.

©Taylor Smith Properties, Inc
Four Copley Place, Suite 120 • Boston, MA 02116 • 617.369.0900 phone • 617.867.9797 fax